Diga di Mujib

Cliente

Paese

Luogo

Inizio

Fine

Documenti correlati

  • Project Name: Mujib Dam
  • Purpose of the project: Irrigation and Water Supply
  • Project location: Madaba Region
  • Hashemite: Kingdom of Jordan
  • Client: Jordan Valley Authority (JVA)
  • Contractor:Aegek-Hydrogradnja J.V.
  • Consultant:Lahamayer
  • Dam Type: RCC with earthfill abutments (clay core)
  • Height above foundation: 62 m
  • Crest level: 199 m a.s.l.
  • Crest length: 750 m
  • Capacity of the Reservoir: 35 million cubic meter
  • Volume of the concrete: 800.000 cubic meter (RCC dam)
  • Foundation soil: Bitominous Lime Stone
  • End of construction: May 2004

Prodotti
Correlati